forums.elationlighting.com  Hop To Forum Categories  Moving Head Fixtures  Hop To Forums  Elation Fixtures    Design Spot 300 Professional Slow Strike
Go
New
Find
Notify
Tools
Reply
  
Design Spot 300 Professional Slow Strike
 Login/Join
 
Posted
I have 6 300 Pro's that all strike extremely slowly... it takes about 25 minutes for the strike on all of them to complete. Am I the only person having this problem and are there possible fixes?
 
Posts: 1 | Location: Michigan | Registered: 24 January 2010Reply With QuoteReport This Post
Picture of jingles
Posted Hide Post
If you are trying to strike all 6 of them at the same time there can be a delay as your circuits are trying to keep up with the draw of the ballast. hope this helps. however i will have one of our service guys take a look at this thread.
Sincerely,


James D. Keeley
Elation Professional
Compu Live/Show/Art 1024/Emulation Tech Support.
Photobucket
 
Posts: 4072 | Location: Wausau,WI | Registered: 07 January 2007Reply With QuoteReport This Post
Posted Hide Post
Hi Greg, my name is Gines and i am the service manager at Elation. please give us a call at 323-213-4593. please make sure you are infront of the units, we would like to go over sometrouble shooting methods so we can determine why this is occuring. BTW this is very strange.

Best Regards,

Gines Gines


Best Regards,
Gines Gines
Elation service manager
 
Posts: 240 | Registered: 18 March 2008Reply With QuoteReport This Post
  Powered by Social Strata  
 

    forums.elationlighting.com  Hop To Forum Categories  Moving Head Fixtures  Hop To Forums  Elation Fixtures    Design Spot 300 Professional Slow Strike

Copyright Elation Professional 2007 Los Angeles, California USA